E EREACE
Back
Reduce losses and riskAgri-Food / Agritech - Operations and Procurement

Predict the Harvest from Satellite to Set Purchase Contracts

An olive oil cooperative buys olives from 4,000 farmers and sells the oil with forward contracts signed in spring. If it overestimates the harvest, it cannot fulfil the contracts; if it underestimates, it sells late and cheap. Today the forecast is made with technician visits to a sample of farms. Free satellite images are available every 5 days for all plots.

Estimated annual impact on EBITDA
+€2.50M
Cooperative that sells €60M of oil a year. Illustrative example with indicative figures: replace them with your own company figures.

Where the money comes from

Penalties and external purchases avoided
+€1.80M
Better price from selling in tranches
+€900k
Cost of images, model and technicians
-€200k
Annual EBITDA impact
+€2.50M
Adds profitReduces profitSystem cost

What to do now

  1. 1Validate the model with the last 2 seasons.
  2. 2Commit to contracts only the low percentile of the forecast.
  3. 3Update the forecast every month and sell in tranches.

For your committee

One page with the decision, the impact, the risks, the steps and the KPI to track.

The print dialog opens: choose "Save as PDF".

Watch out: more volume is not always more profit

Committing the entire forecast volume to contracts to lock in the price: if the harvest turns out smaller, you have to buy oil externally at a higher price. Commit in tranches according to the uncertainty.

KPI for the committee

Production forecast error and average selling price.

Detail for your data team

Proposed technique: Neural Networks (Deep Learning / CNN)

Why: The signal is in multispectral images that change over time: canopy density, vigour, water stress. Convolutional neural networks (combined with temporal layers) extract those patterns from millions of pixels and relate them to the historical production of each plot.

Cost of getting it wrong: Overestimating forces buying oil externally to meet contracts (expensive); underestimating forces selling the surplus late and at a worse price.

Data needed: Multispectral satellite images of 30,000 plots every 5 days (vegetation health, moisture).; Actual production of each plot over the last 8 seasons.; Weather: rain, heatwaves, frosts at flowering.; Plot data: age of the grove, irrigated or rain-fed, variety.

The Ereace system

Test decisions with synthetic people before you test them with real ones.

This tool helps you decide with numbers. Before you invest, understand, test and rehearse the decision with the people involved: your customers, your team or your committee.

Understand
QualiSynth

Before you invest, find out what your customers think, need or reject about the initiative.

Test
StrataSynth

Put the offer, the message or the journey in front of synthetic people who do not always follow the happy path.

Train
ArenaSynth

Rehearse the committee presentation or the vendor negotiation against synthetic decision-makers.

See all Ereace products

About this tool. It is free and made by Ereace, an AI-native product studio and human intelligence ecosystem: it connects real human signals, synthetic people and the systems built around them, so teams can understand, test and act on human behavior before decisions reach the real world. About Ereace

Comments or suggestions? info@ereace.es